On 7 June members of Carriageworks Action Group were given access to the site. Safety issues meant we couldn’t enter the buildings (or even get up next to them) but Wrings, the demolition contractors, were brilliant in getting us as close as possible and explaining everything that was going on.

While work has not yet started on either Westmorland House or the Carriageworks, the rest of the site has been cleared and demolition has started to a smaller building backing onto Croft Dale (Hepburn Road).

DSC_4090.JPG

Cleared site. No.4 Ashley Road (the old Doctor’s surgery) has completely gone (we were told it virtually fell down by itself it was so weak). Once demolition is completed the archaeologists will dig an investigation trench – it’s possible that they will find fortifications from the civil war (Cromwells forces camped at Montpelier Farm in 1645 and then attacked the royalist held Priors Hill Fort, now Freemantle Sq at the top of Nine Tree Hill. Spurworks or redoubts below the fort may have been on the Carriageworks site).

DSC_4127.JPG

Rear view of Tucketts building. Negotiations about the party wall are ongoing with the owners.

DSC_4102.JPG

This building backs onto and is attached to Croft Dale (Hepburn Road). As a result it’s being demolished by hand. The steel cross beams visible at the top of the picture will be lifted out by crane next week (beginning 11 June).

DSC_4104.JPG

The scaffolding has been built to cantilever out over Croft Dale, giving safe access to the upper parts of the building being demolished.

DSC_4099.JPG

Vast amounts of rubble are being created. This pile is from the building backing Croft Dale. Much of it will be crushed and reused on site, but the total volume will exceed that which is needed, so the rest will be removed.

DSC_4101.JPG

This is the back wall of Kuumba. There’s a significant difference in levels between Kuumba (Hepburn Road) and the Carriageworks site. The building backing Croft Dale is in the background.

DSC_4113.JPG

The rear view of the Carriageworks. Fire went through the building many years ago so it still isn’t safe to access. There are bats inside which has caused delays in getting access. You can clearly see the roof line and northlights of the workshops that attached to the back of the building.

DSC_4117.JPG

The rear wall of the Carriageworks is older than the frontage but of less architectural significance. You can see some of the old stonework where the more modern render has detached. The whole building is listed, so the rear wall is also protected.

DSC_4105.JPG

Rear view of Westmorland House, completed in 1966 but only occupied for about 16 years, it has now been derelict for 26 years.

artwork.png

Covered in streetart / graffitti and imposing itself on the local landscape and culture, Westmorland House has echos of and almost the same age as the Berlin Wall (1961-89).

DSC_4110.JPG

 

While scaffolding has been installed to give a degree of safety, the workers rarely enter. In the past however many people have been in, as evidenced by the graffitti. Tragically the inherent danger of the building resulted in a number of people losing their lives here.

DSC_4121.JPG

Over the years the interior of Westmorland House was heavily vandalised. Asbestos ceiling tiles were pulled down and dumped in the lift shaft, making for a more difficult removal job.

DSC_4130.JPG

The boardroom in Westmorland House was panelled with Nigerian Pear Wood and had a domed roof light just visible in this picture. You can read more about the building as it was on our stories page. All the valuables were plundered in the 1980s.

basement.png

There’s a basement below Westmorland House, totally filled with rubbish, needles etc. This will all have to be cleared out before demolition can begin.

20180607_163522.jpg

Wrings have got some very nice toys.

DSC_4078.JPG

Familiar sight of the Carriageworks frontage. Before works begin this will be shored up which will mean narrowing of the road. First of all though Wrings need to make the interior safe engough to go inside and assess the structural strength of the building.

DSC_4077.JPG

Frontage of Westmorland House. Beneath the building is a single storey basement that will have to be cleared and then dug out – necessitating shoring up of the road. The basement will then be backfilled in layers to help provide a foundation for the new building.

20180607_163550.jpg

Staff on the site have created a little gallery of items and artwork discovered.

Thank you very much to Wrings and PG Group for giving us this viewing of the site.

One thought on “Photos from a Site Visit

  1. Years of fascinating history spread out before us – i love this area of Bristol – a unique gateway to the city – thanks so much for all your commitment and hard work. With love, Lynne.xxx

Leave a Reply

Your email address will not be published. Required fields are marked *